Commercial Construction

Shopfronts, clinics, workshops and small office buildings where the opening date matters as much as the drawings. We plan the build around your fit-out and licence timelines so the space opens when you said it would.

What is included

Everything in the scope, written down first.

  • 01Programme built backwards from your opening date
  • 02Services coordination: electrical load, plumbing, fire and HVAC routing
  • 03Phased handover so fit-out can begin while finishing continues
  • 04Support with local body and fire clearances
  • 05Single point of contact for consultants and vendors
Two tall buildings side by side, one still under construction, Surat, India

14 weeks

shell to fit-out-ready, typical for a 6,000 sq ft unit

A project in this scope

A knitwear exporter needed a new stitching floor ready before the autumn order book opened. Working backwards from that date, we phased the shell, roof and services so machines could be installed while the finishing crew was still on site.

Start here

Tell us what you are planning.

Three short steps, and a real person calls you within one working day.

+91 422 400 0142

No. 42, Avinashi Road, Peelamedu, Coimbatore, Tamil Nadu 641004

Mon to Sat, 9:30 am to 6:30 pm

Step 2 of 3

Tell us a little more